[Construction Example] Logistics Center: Floor Leveling Work for Concrete Slab

Forklift operation is possible immediately after construction completion! The unevenness caused by the earthquake has been corrected in a short period.

Here is an example of "floor level adjustment work" carried out at a logistics center in Kumamoto Prefecture. Due to the impact of the Kumamoto earthquake, floor subsidence occurred. As a result of the subsidence, a height difference was created, making it difficult for forklifts to operate for transporting goods. Using two trucks loaded with Upcon equipment, we quickly corrected the subsidence. Immediately after the completion of the work, forklift operations became possible. 【Case Overview】 ■ Construction Area: Approximately 1798.5m2 ■ Maximum Subsidence: 107mm ■ Area: Logistics center in Kumamoto Prefecture ■ Construction Period: 6 days *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Ground foundation construction method
  • Civil Engineering Method
  • Floor elevation correction work

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

Floor elevation correction workの関連カテゴリ